Laserfiche WebLink
---• <br />TYPE OR PRINT CLEARLY ~ <br />14. Present land use <br />(i.e., agricultural, industrial, etc.) <br />15. Proposed future land use <br />(Goal of reclamation) <br />This application form must be submitted in duplicate and each fora must <br />be accompanied by the following information and items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-dap) for additional guidance. <br />E7ffiIBIT A - Legal Description <br />The legal description must identify the affected land and be wholly adequate for <br />field location of the property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter section. Where applicable, the street address or lot <br />number(s) may be used. <br />E103IBIT B - Miniast Plaa <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan shou3id be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. <br />EEHIBIT C - ~fao <br />This map should be as comprehensive as possible is terms of clearly defining <br />the permit boundaries and indicating all roads or stockpile areas to be used in <br />connection with the operation. All immediately adjacent landowners must be shown. <br />The closest quarter section corner, section line, or any other locateable point <br />should also be shown on the map. <br />Ex1iIBIT D - Wildlife, Water Resources, Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined is the <br />applicable Rule, under item number tea (10). <br />E.4HIBIT E - Reclamation Plaa <br />As with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process sad those portions of <br />load affected by each. If possible, the plan should be closely correlated <br />with the map. If not, the narrative must be comprehensive enough to draw an <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />E~IBIT F - Proof of Local Government Approval <br />This must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />E~IBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax <br />receipt. Ia lieu thereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECIAL 10-DAY PERMITS ONLY** <br />ERHIBIT H - Reclamation Costs <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. <br />E.4HIBIT I - Terms of Governmental Contract <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it was required. <br />