Laserfiche WebLink
• ~T I <br />e 5 of 10 <br />Permit No.. CO-0030546 <br />• A. MANAGEMENT REQUIREMENTS <br />'~' 1. Lhange in Discharge <br />All discharges authorized herein shall be consistent with the terms and <br />conditions of this permit. The discharge of any pollutant identified <br />in this permit more frequently than or at a level in excess of that <br />authorized shall constitute a violation of the permit. Any anticipated <br />facility expansion=, production increases, or process modifications <br />which will result in new, different, or increased discharges or pollutants <br />must be reported by sumbission of a new NPDES application or, if such changes <br />will not violate [he effluent limitations specified in this permit, by <br />notice to the permit issuing authority of such changes. Following such <br />notice, the permit may be modified to specify and limit any pollutants <br />not previously limited. <br />2. Noncompliance Notification. <br />If, for any reason, the permittee does not comply with any maximum effluent <br />limitation specified in this permit the permittee shall provide [he Regional <br />Administrator and [he State with the following information, in writino, <br />within five (5) days of becoming aware of such condition: <br />a. A description of the discharge and cause of noncompliance; and <br />• b. The period of noncompliance, including exact dates and times; or, if <br />not corrected, the anticipated time the noncompliance is expected <br />to continue, and steps being taken to reduce, eliminate and prevent <br />recurrence of the noncomplying discharge. <br />3. Facilities Operation <br />The permittee shall a[ all times maintain in good working order and <br />operate as efficiently as possible all treatment or control facilities <br />or systems installed or used by the permittee to achieve compliance <br />with the terms and conditions of [his permit. <br />4. Adverse Impact <br />The permittee shalt take ail reasonable steps to minimize any adverse <br />impact to navigable waters resulting from noncompliance with any <br />effluent limitations specified in this permit, including such accelerated <br />or additional monitoring as necessary to determine [he nature and impact <br />of the noncomplying discharge. <br />5. Bypassing (see additional requirements under Part III) <br />Any diversion from or bypass of facilities necessary to maintain com- <br />pliance with the terms and conditions of this permit is prohibited, <br />except (i) where unavoidable Co prevent loss of life or severe property <br />damage, or (ii) where excessive storm drainage or runoff would damage <br />any facilities necessary for compliance with the effluent limitations <br />and prohibitions of this permit. The permittee shall promptly r.o[ify <br />the Regional Administrator and [he State in writing of each such diversion <br />or bypass. <br />