Laserfiche WebLink
~¢ <br />~~ <br />Go' <br />-- • .. ~ III IIIIIIIIIIIII III <br />Tectonic Constr~cti m Co. eas <br />1950 W. Dartmou Ih <br />Englewood, Colo ~do 80110 <br />'' VISION <br />.... w,2~ i, I`3tlb <br />Tectonic Construction Co <br />1950 W Dartmouth <br />Englewood, CO 80110 <br />Re: M-84-099- Bailey Pit, Permit Issuance <br />Dear <br />On September 29, 1986, the Mined Land Reclamation Division found J-Bar-B Inc <br />to have satisfied the applicable requirements of CRS, 34-32-101 et seq. for <br />obtaining a mining and reclamation permit. Therefore, a permit is Ong <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. Asa reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, September 29, you must submit <br />an annual fee and an annual report to us. The annual fee for this permit is <br />500,350.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, <br />DAVID C. SHELTON <br />Director <br />Enclosures <br />423 Centennial Building, 1313 Sherman t •et <br />Denver, Colorado 80203 Tel. (303) 866.3567 <br />