Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency ar organization name : DMG <br />Tasku: lOd SUte:Coloratlo Permtlob x:M-2000.025 <br />Date: 06292004 Counry :Delta Abbreviation :rrone <br />User: SSS Site :North Fork Pd Filename:M02$-t0a <br />Pemut or other job action <br />Task tlescription <br />Shits basis : 1 <br />Cost data source : C <br />Track tractor tlesuiption <br />Truck railer tlescdption <br />ROADABLE EQUIPMENT <br />Machine <br />Description Total <br />CosOhouquntl Fleet Size <br />(NO. units) Haul Trip <br />CosWrHleet Return Tnp <br />CosHnr/Fleet <br />-Generic 1518 cy 6x4 8]8.31 f0 8]83.10 $783.10 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5783.10 f783.f0 <br />EQUIPMENT NAUL DISTANCE and TIME <br />Nearest major ary or town vnthin project area region : Paonia <br />Tansoodation Cvcle Tme ~ Non- I Total one-way tavel bistance : 6.0 nines <br />RoadaNe Readable Average travel speed : 35.0 mph <br />Haul time (hours) = 014 0.14 Total non-roadable mob/demob wst': 81,508.Od <br />Retum lime (hpua)= 014 0.14 'ewa mum uipswM muliq <br />Loatling time (hours) = 0.50 NA Tatal roatlable mob/demob wst": $223.74 <br />Unloading M1me (hours)= 050 NA one mum mp.romwiq <br />JOB TIME AND COST Total job time: 2.57 hours <br />Total iob wst : 51,732 <br />