Laserfiche WebLink
EXHIBIT L <br /> RECLAMATION COSTS <br />An opinion of probable cost for the interim phased reclamation follows; <br />ITEM QUANITY UNIT COST COST <br />Replace Top Soil 14,837 CY $.50/CY $7,418.50 <br />Soil Preparation 1,201,820 SF $0.08/SF $96,145.60 <br />Seed 1,201,820 SF $0.04/SF $48,072.80 <br />Mulch and Crimes 27.59 ACRE $600/ACRE $16,554.00 <br /> <br />TOTAL $168,190.90 <br />As previously discussed, the mine site is ultimately to be inundated with impounded <br />water as a result of the Glade Reservoir project. Any cell <br />2~ <br />