Laserfiche WebLink
rayc c <br />.~ <br />yM1. <br />~~ <br />~ ~ EXHIBIT B - MINING PLAN <br />No contract has been awarded for this project ~ date. <br />+` Therefore the type epment~that the contractor <br />wi?1'trs2 is unknown to the Highway DApartment. <br />The following equipment might be used in the pit area: <br />front-End Loaders, Dozers, Motor Graders, Dump- <br />Trucks, and a Screening Plant. <br />The top 6" of material will be stockpiled and placed over <br />the mined out area. The back slopes will be no greater <br />than 2:1. <br /> <br />_ Y -• <br />r s <br /> <br />