Laserfiche WebLink
,} <br />-3- <br />of for DP Entryl <br /> Permitted Actual Proposed • <br />7. Mineral ownership: <br />(indicate currently <br />permitted acre for each) <br />Federal -0- ac., <br />State -o= ac., <br />Private174.09ac., 174.09 115 -0- <br />Indian -_- ac. <br />8. Surface ~nership: <br />(indicate currently <br />permitted acreage for <br />each) <br />Federal-o- ac., <br />State -0= ac., <br />Private174.o9ac•. 174.09 174.09 -o- <br />Indian _D_ ac. <br />9. Affected area (in acres) 174.09 174.09 -o- <br />10. Disturbed area (in acres) 115 115 -0- <br />11. Acreage of area reclaimed <br />in previous permit term <br />a) backfilled and graded n/a _D_ n/a <br />b) retopsoiled n/a _D_ n/a <br />c) reseeded n/a _o_ n/a <br />12. Acreage for which bond <br />has been released -o- <br />a) 60 percent n/a _p_ n/a <br />b) 85 percent n/a _D_ n/a <br />c) 100 percent n/a _o_ n/a <br />13. Renewal Term Requested <br />(Years) n/a n/a 5 <br />ear <br /> y <br />s <br />)Note: If the application contain s proposed (new ) acreage, t hen a permit <br />I revision application form must also be co mpleted for those acreages. <br />14. Type of Mine (check one): Underground, <br />Surface, x <br />_ <br />Combined Surface and underground. Load-Out, Other. <br />15. Current Permit Status (check one): Active, xx Temporary Cessation, <br />Permanent Cessation (reclamation only), Suspended <br />16. Current Estimated Life of Mine in years: 0 5 <br />