Laserfiche WebLink
� 111 II I IIIII l IIIIIII <br /> I�Al <br /> ' EXHIBIT L <br /> RECLAMATION COSTS <br /> CLIFTON WATER GRAVEL PIT <br /> ' Reclamation costs can be seperated into three phases: <br /> 1. Sloping the perimeter of the pit. <br /> 2. Spreading topsoil from stockpile. <br /> 3. Seeding. <br /> ' Reclamation costs are based on reclaiming the site in phases. Seeding is based on two applications <br /> of the entire area requiring seeding. <br /> ' 1. Backfilling slopes- 16,100 C.Y. @$0.85/CY..............................$13,685.00 <br /> ' 2. Spreading topsoil- 800 C. Y. @ $2.50/CY.................................$ 2,000.00 <br /> 3. Seeding- 8.4 Acres @ $600.00/Ac.............................................$ 5,040.00 <br /> $20,725.00 <br /> tSay $21,000.00 <br /> 1 <br />