Laserfiche WebLink
• <br />RECLAMATION COST <br />(1) Redistribution of topsoil <br />40 ac x 5" = 27,104 cy @ $1.50/yd = $40,656.00 <br />12) Fine grade pit floor <br />33 ac @ $100.00/ac = 3,300.00 <br />Fine grade slopes <br />7 ac @ $250.00/ac = 1,750.00 <br />~J <br />(3) Dri11 & broadcast grass seed <br />40 ac @ $150.00 = 6,000.00 <br />(4) Maintenance of critical areas <br />10~ of slope area =.7 ac 991.00 <br />TOTAL PER 40 ACRE PHASE <br />$52,697.00 <br /> <br />