Laserfiche WebLink
r • III III III III IIII III • <br />Peck, Inc. <br />P.O. Hox 278 <br />Ouray, Co. 81427 <br />Colcradc Mined Reclamatio.^^. <br />Attn: Tcm Schreiner <br />1313 Sherman Street. Rm 215 <br />Denver. CC 30X3 <br />Dear Tom: <br />°.E: Response of Peck Inc to your letter dated May 5. 1992. <br />1. OFF SITE IMPACTS: <br />': he Charley Logan Ditch and the Sewer Lagoon are over <br />200 feet beyond the permit bcurdary. Mininc will not take <br />place any closer than 200 feet from any man made structure. <br />except the Walz Ditch. A letter agreement between Allan <br />r i ~ i. a t~ ..d: t tL, r Dit ~" <br />r7a..z and I. c., ec rega. .ag damages o ...e Aalz c.. is <br />enclosed. <br />': he low flow channel of the (Incempahgre River will <br />rer..ain at its present location (see enclosed Map Exhibit E;. <br />The main charnel of the River is the ..urgent low water <br />channel. During hick water (sprirc runoff May and June;. <br />the Rive: floods the bar to be mined through the high water <br />channels depicted on Exhibit E. These than..^.els are between. <br />2 and 3 feet higher than the low water charnel elevation. <br />If the River were to change course, it woul3 be to one <br />of these channels and mcst likely the channel which starts <br />at survey point GTR-20 (channel furthest east;. The channel <br />would, as the high water channel dces presently, proceed <br />th tc t 't E This <br />nor wes, reioin he River as s own. or. Ex.~b~ <br />channel presently carries apprcximately 1;5 of the spring <br />runcff flood water and this will not change due to mining. <br />The 2 tc 5 feet of gravel removed by mining will effectively <br />lessen the flood potential to the area east and north of the <br />Permit area. °y removing the 2 to 5 feet o: gravel and <br />creatinc a flat, slightly northwest dip to the pit bottom, <br />the flood :raters which are normally contained within a 5 tc <br />10 foot wide flood channel will be spread over a 300 foot <br />wide bench, and will be directed away from the eastern and <br />rortherr. banks by the northwest and west dips of the pit <br />bottom. During .,.~. ~ng, overall total flow rates or. the <br />P.iver will not be changed. The 3 to 1 slope cn the northern <br />end cf the pit area will act as a drop structure, slowing <br />the flows before they leave the permit area and flowing onto <br />the Imhoff property. They will stop any channel scouring. <br />*:one ~ cccurring at present ~.. this location due tc lcw <br />:lows from the flood channel. <br />Flows throuch the flood channels in the pit area durirc <br />the past twe years high ,.Hoff periods carried approximately <br />1;5 cf the total Riser vcl:.me and aas confined to the three <br />channels. tctal,^g appr.,~~mately 20 feet ~.. width. If t.`.is <br /> <br />