My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71530
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:49 PM
Creation date
11/20/2007 11:53:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981229
IBM Index Class Name
Permit File
Doc Date
6/20/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- - -- _.. <br /> <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WORK <br />Task #: 2a Prep. by: TDG Task File Name: M229-2a <br />Date:- 06/20/97 Permit #:M-81-229 Mine: Valley Vista Pit <br />Permit Action: Bond Recalculation in response to S 0. Approval <br />Task Description: Regrade/level pit floor areas <br />HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9N Horsepower : 370 <br /> Blade Type: SEMI-UNIVERSAL ------ <br /> Attachment #1: ROPS Cab Shift Basi s: 1/day <br /> Attachment #2: 3-shank ripper --------- <br />Cost Breakdown: <br />------------- Utilization X <br />Ownership cost/hr = 543.41 N/A <br />Operating 8 overhaul Lost/hr- dozer = 514.86 100 <br /> -ripper = 50.00 0 <br />Operator cost/hr = 522.95 N/A <br />Total egp t. unit cost/hr = 5141 21 Total fleet cost/ hr : 5282.43 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 10.099.0 L CY Factor: N/A Volume: 1 <br />----- 0.099 <br />----- .0 <br />-- LCY <br />- <br />------------ <br />Source of quantity ta ke-off: Assume 6. ---------- <br />26 at. of 10.0 ac. phase @ 1 ft. depth <br />Source of est. swell factor: NA <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Avg. push distance: 50 ft. ------------------------ ----- -- <br />- ------- Operator.......... 0. 75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0. 90 (Cat tbl) <br />dozer production: 1696 LLY/hr Dozing method..... 1. 00 (gen.) <br /> ------ Visibility........ 1. 00 (avg.) <br />Material consistency: Job efficiency.... 0. 83 (lsh/day) <br />Compacted fill or embankment Spoil pile factor. 0. 80 (fnd-rf) <br />------------------- ------- -------- Push gradient..... 1. 00 (Cat tbl) <br />Avg. push gradient: 0.00 X (pos) Altitude deration. 1. 00 (Cat tbl) <br />- -------- Material weight... 0. 79 (Cat tbl) <br />Avg. site altitude: 4980 ft. Blade type........ 1. 00 (S or U) <br />Material weight 2900 00 lb/LCY Net Job Correction : 0. 36 <br />Mat. Descr.: ------- ---- ----- -- <br />Decomposed rock - 50X Rock, 50X Earth Adjusted Unit Prod.: <br />-- 602. 56 LCY/hr <br />--------------- - Adjusted Fleet Production: 1205. 13 LCY/hr <br />JOB COST -- --- -- <br />Fleet size 2 Dozers) Total Job Time: <br />--- 8. <br />----- 38 <br />-- Hours <br />- <br />Unit Cost ---- <br />50.234 /LCY Total Job Cost: 52 .366. 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.