My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71530
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:49 PM
Creation date
11/20/2007 11:53:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981229
IBM Index Class Name
Permit File
Doc Date
6/20/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br /> <br /> <br />sheet 1 of 2 sheets <br />6 DOZER COST 8 PERFORMANCE DATA f10RKSHEET <br />Machine Make 6 Model: Cat D9N <br />Dozer Blade: SERI-UNIVERSAL <br />Attachment #1: ROPS Cab <br />Attachment #2: 3•shank .ripper <br />Last Cost Revision: April, 1996 <br />BASE EQUIPMENT COSTS {CRG) <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Cost Guide (CECG) <br />3) Colorado Contractors Association <br />1Ja9e Rate Schedule <br />4) Caterpillar Performance Handbook <br />~----------• Base Ownership 6 Overhaul Costs -•---•------~-•---•-----~--~ Base Operating Costs <br />~ Ownership ~ Overhaul ~ Field Repair ~ <br />~ Depreciation CFC Overhead ~ Labor Parts Labor Parts ~ Fuel Lube <br />Tires G.E.C. <br />Machine 519.11 58.22 58.44 55.21 517.29 66.17 514.03 fIZ.82 54.78 50.00 52.34 <br />Attachment #1 50.00 30.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment $2 f3, 94 50.89 50.51 50.77 57.54 51.41 51.29 50.00 50.33 50.00 51.08 ' <br />COST ADJUSTMENT FACTORS (CECG) <br />Factor Description Base Value Adj. Value Multiplier <br />Acquisition cost: 1465.920,00 5338.176.85 0.726 <br />Econ. life hrs.-machine: 15.350 11.500 1.335 <br />•attach. #1: 11.000 11.000 1.000 <br />-attach. #2: 8.200 8,200 1.000 <br />Annual use hours: 2.112 1.650 1.142 <br />Mechanic's labor cost: 527.15 523.32 0.859 <br />Fuel cost/gal.-gasoline: t1.16 51.16 1.000 <br />diesel: 50.99 50.99 1.000 <br />Cube cost: 54.22 t4.22 1.000 <br />lire life hours: 0 0 1.000 <br />Tire Tactor: 0 0 1.000 <br />Tire cost: 50.00 50.00 1.000 <br />ADJUSTED EQUIPMENT COSTS <br />ACQUISITION COST BREWCDONN <br />Cost Elements (CECG) Factor <br />. Adj. Cost <br />... <br />....... <br />........................ <br />Base purchase price .... <br />... . <br />. <br />5465.920. 00 <br />Less dealer discount 0.142 566,160. 64 <br />Plus freight 0.020 59,318. 40 <br />Plus dealer charges• 0.005 52,329. 60 <br />~NLRD estimate --- <br />Adjusted purchase price 5411.407. 36 <br />Plus Lazes: Sates @ 3X 312,342. 22 <br />SHM @2X 38,228. 15 <br />Less Lire cost 50. 00 <br />Less salvage value 0.228 593.800. 88 <br />Net acquisition cost 5338.176.85 <br />............................. ............... <br />Adjusted G+nership d Overhaul Costs -•~----•~~--•----•---•- Adjusted Operating Costs <br />Acquisition cost 516.73 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Econ.lile -Dozer E ROPS 522.33 N/A N/A 51.03 523.08 58.24 518.73 N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 51.03 52.06 51.88 51.72 N/A H/q N/A N/A <br />Annual usage 519.10 510.40 510.67 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts 316.15 55.20 55.34 N/A M/A N/A N/A N/A N/A N/A N/A <br />Triple shifts 314.89 63.46 63.55 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech. labor•Cozer b ROPS ~ N/A N/A N/A 56.04 N/A 57.08 N/A N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 50.88 N/A 51.62 N/A N/A N/A N/A N/A <br />Fuel/lube •Dazer 8 ROPS N/A N/A N/A N/A N/A N/A N/A 512.82 54.18 50.00 62.34 <br />-Attach. #2 N/A H/A N/A N/A N/A N/A N/A 50.00 50.33 50.00 31.08 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.