Laserfiche WebLink
<br /> <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Eqp. <br />Cost/hr <br /> <br />Fleet Size Haul Trip <br />(no. hauled) Cast/hr <br />sheet 2 of 2 <br />Return Trip <br />Cost/hr <br />Flatbed Truck <br />f39.72 <br />1 f39.72 f39.72 <br />Subtotals 539.72 539.72 <br />MOB/DEMOB SUPPORT EQUIPMENT: -------- -------- <br />------------------------ Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non~Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />None <br />Subtotals 50.00 50.00 so.oo <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />None <br />Subtotals <br />EQUIPMENT HAUL DISTANCE & TIME <br />Nearest major city or town within project area region: Grand Junction <br />Total one way travel distance = 10.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= - 0.50 hours load Roadable Equip.= <br />0.40 hours haul <br />0.50 hours unload <br />0.40 hours return <br />JOB LOST <br />Total Mob/Demob Lost = 52.514.65 <br />50.00 50.00 <br />25.00 mph. <br />N/A hours load <br />0.40 hours haul <br />N/A hours unload <br />0.40 hours return <br />..................... <br />NOTE: Non~roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one~way loaded haul and a one~way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />