Laserfiche WebLink
SECTION 3 -A <br />SCALE 1" = 20' H &V <br />EXISTING SLOPE <br />SECTION 3 -13 <br />SCALE 1 " = 20' H &V <br />CHECKED BY- <br />NOTES, SECTION 3 -A <br />1. SLOPE SURFACE OF DIVERSION CHANNEL <br />BACKFILL TO THE APPROXIMATE ORIGINAL SLOPE. <br />2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br />AND REVEGETATE. <br />3. PLACE THE FILL IN APPROXIMATELY HORIZONAL <br />LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br />BY ROUTING THE CONSTRUCTION EQUIPMENT <br />UNIFORMLY OVER THE FILL SURFACE. <br />4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br />OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. <br />NOTES, SECTION 3 -13 <br />1. SLOPE SURFACE OF DIVERSION CHANNEL <br />BACKFILL TO 3H:1 V OR FLATTER. <br />2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br />AND REVEGETATE. <br />3. PLACE THE FILL IN APPROXIMATELY HORIZONAL <br />LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br />BY ROUTING THE CONSTRUCTION EQUIPMENT <br />UNIFORMLY OVER THE FILL SURFACE. <br />4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br />OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY <br />RECB'� -'D <br />APR 2.9 , - -3 <br />DilAsion of Minmis L i ovry <br />APPRovo <br />