My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71505
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:48 PM
Creation date
11/20/2007 11:53:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002003
IBM Index Class Name
Permit File
Doc Name
FAX COVER
From
DMG
To
MEGAN KABELE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 112 <br />Hard RocklMetal Mining Rule 6 <br />(b) Tailines: Describe the geochemical constituents of the tailing <br />or leached ore, the chemistry of any leachate, anticipated impacts to ground <br />or surface waters and design details such as liners, ponds and embankments, <br />diversions or chem_ ical treatment facilities to be used to coatrol these impacts, <br />and ground and surface water monitoring systems, to include proposed <br />groundwater points of compliance. <br />(c) Drainage Control: Describe the measures used to divert <br />upland drainage away from the site both during and after operation. This <br />must include design details demonstrating the capacity of ditches and <br />impoundment structures to contain operating solutions and the volume of <br />water generated by a one hundred (100) year 24-hour rainfall event. <br />(d) Maps and Plans: Design drawings must, at a minimum, <br />describe specific design details for tailing ponds and embankments, ponds and <br />ditches, ore and tail transport systems, and ground and surface water <br />monitoring systems. <br />6.3.4 EXHIBIT D -Reclamation Plan <br />(1) The purpose of the Reclamation Plan is to describe the timing, <br />procedures, criteria and materials that will be used to reclaim the affected land to the <br />proposed future land use. This plan must be correlated to Exhibit E -Map. The <br />description of the Reclamation Plan must be adequate to satisfy the requirements of <br />Section 3.1 and demonstrate compliance with Rule 3. At a miniIImm, the Application <br />shall include the following information: <br />(a) specify at what point in the mining plan and to what depth(s) <br />overburden will be replaced in relation to ongoing extraction. <br />(b) specify the maximum gradient of reclaimed slopes <br />(horizontal:vertical). If the Application proposes slopes steeper than 3:1, the <br />Operator/Applicant must include a justification that supports steeper slopes <br />for the proposed post-mining land use, and demonstrates compliance with the <br />applicable performance standards of Section 3.1. <br />(c) specify the measures that will be taken to revegetate the site, <br />if applicable, including: <br />
The URL can be used to link to this page
Your browser does not support the video tag.