Laserfiche WebLink
• RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />DA <br />PILELD.NO. ]211-CO-09-01370-0] (SURFACE WASTE PILE) <br />PILE LD. NO. 1211-CO-09-01370-02 (OLD N0.9 EXCAVA <br />/I~p~ <br />INSPECTOR SIGNA <br />INSPECTOR TITLE: 1~--~7~• /// ' ~ . ~, <br />Under the supe \sion of Gary Buchan, Colorado P. N <br />This inspection was conducted to comply with DMG Rule 4:09.1(11). <br />This inspection was conducted to evaluate: <br />'~ A. Stability of fill (quarterly inspection) <br />~'~B. Critical construction periods: <br />1. Removal of all organic material(topsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />• filed \EN\ENVIRONMENTAL\EMPIRE\INSPREP\WASTEPILEFORM.DOC <br />5. Revegetation <br />