My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71468
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:44 PM
Creation date
11/20/2007 11:51:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977196
IBM Index Class Name
Permit File
Doc Date
8/31/1977
Doc Name
MINING PERMIT APPLICATION FOR PROPOSED BUENA VISTA QUARRY NEAR BUENA VISTA CHAFFEE COUNTY COLO JOB 1
From
WOODWARD CLYDE CONSULTANTS
To
HART ROK REDI MIX CONCRETE INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />' Alf G 31 1977 <br />j~ EXHIBIT B <br />MINING PLAN RECLAMAT;ON SECTION <br />Colo. Dept. of (Vaturaf Resources <br />' The Buena Vista pit is planned as a source of sand and <br />' gravel for a portable ready mix concrete plant installed <br />at the site and as a source of granular materials for general <br />' fill and construction. <br />' The quarrying operation will be performed with a front- <br />end-loader, loading directly into trucks for haulage to the <br />' point of use. The quarrying operation will start along the <br />southeast side of the pit nearest the previously existing <br />~ , access road and will proceed in a westerly direction to the <br /> extent of the pit boundary. <br /> lifts <br />rd i <br />Th <br />i <br />ti <br />ill <br />d <br /> ownwa <br />n <br />e quarry <br />ng opera <br />on w <br />progress <br /> or benches. The front-end-loader will establish a ramp by <br /> excavating down to a bench level in the pit and then expand <br /> the bench to the limits of the pit boundary. On completion <br /> of the first bench, another ramp will be established to the <br /> subse <br />uent bench level <br />Bench hei <br />ected to <br />hts are not ex <br /> q <br />. <br />g <br />p <br />' exceed 10 feet, which is the approximate limit of a front- <br /> end-loader reach. <br /> Production is not expected to be continuous for the life <br /> of the quarry, but will be on an intermittent basis, depending <br /> on concrete demand in the Buena Vista area or other such <br />' <br />P construction contracts as the operator may win. Initial <br /> <br /> B-1 <br /> <br />\~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.