Laserfiche WebLink
l <br />a <br />s; { <br />i <br />t <br />r;. <br />1, <br />f <br />t <br />30 0 30 <br />60 -)raina e <br />Scale 1 " = 30' <br />Contour Interval = 2.0 <br />f <br />Bison <br />Street <br />60.0' <br />00 <br />rn <br />�Q <br />a � <br />O J <br />O' <br />4; <br />,\ L <br />0 <br />� <br />-0 <br />O <br />i � <br />CD <br />at 0 <br />Q <br />n � <br />A <br />O 'o v <br />i <br />in <br />Slit Fencing <br />Double S' <br />Wide Got* <br />v U) o <br />M O <br />77 �. <br />tin <br />In <br />Double 10' <br />Wide Cate <br />�0 <br />O�Z <br />..L <br />Permit # — all Confidential? <br />Class C4tjDk[ Type Seq <br />MV# Inspec on Date <br />Doc Date (if no date stamp) Y l r 1 <br />Doc Nam�® <br />From DRMS /Ot MS/Other <br />To DRMS /O�ie <br />Recipients �-11�1 <br />Cro wn P a &W 7•e <br />Point c•Ifw, Cyt,. m 61216-0740 <br />714- Q7a-MM c7boa MY <br />Land >ti4 eye 1y O"r <br />naPEY -YJ,e lYr <br />Services <br />RECEIVED <br />(JUN 13 2007 <br />pryision of RiSa etil n <br />n <br />Mining ed <br />1131T E! <br />pproac <br />2.6% erode <br />Oci way- <br />Flow Directi ^n RB <br />4! 0 <br />Nu m <br />1 et 4 ��:' r <br />S 'i- <br />ecurl L..Y <br />Ln <br />00 <br />0i <br />N <br />W <br />6 L4 <br />Silt Fencing 0 sr >. <br />Flow Direction + W © O�• B <br />am Silt Fencing C '011 o <br />OFlow Direction <br />N 03 °45'00" W 600.08' g ,�►,� <br />Drainage <br />D berm ! fence <br />0 o <br />oC) <br />tin ON <br />. D / <br />-10% Grade <br />S 00.38'00" E 614.10' <br />V <br />c <br />4 <br />a <br />2' Standard Slit Fencing <br />Exlyling <br />' T <br />la <br />v <br />C <br />O <br />m <br />DRAINAGE DETAIL "A" <br />West Side <br />eliminate onsite drainage <br />from leaving site <br />Roadway Flow Direction <br />ODrolnage berm k fencing <br />Flow Direction <br />Flow Direction <br />Y <br />4 <br />U <br />U <br />u <br />N <br />f <br />2:1 Slope / \ 2:1 Slope <br />r 4 <br />Existing <br />'T <br />(a <br />c <br />c <br />m <br />I<� <br />Drainage Berm Detail "B" <br />East and North Sides <br />to eliminate offsite drainage <br />O <br />Flow Direction <br />CO <br />Offsite Drainage <br />Flow necl:on <br />The berm along the North and East side of the permit lines shall be constructed in a <br />manner in which all offsite storm water will not effect the site In any way. This will be <br />graded In a manner which allows the water offsite to be directed around the permlted <br />area. <br />Onslle Drainage <br />The fencing along the West side, also being the silt fence. shall be of o material that will <br />control oil debris from leaving the site. The pit floor will be o retention area which will <br />allow natural evaporation along with normal seepage. <br />Sheet 4 of S <br />1 <br />I <br />I r. <br />�sl <br />i <br />