My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30046
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:52 PM
Creation date
11/20/2007 11:51:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Hydrology
Doc Date
4/11/2005
Doc Name
1st Qtr 2005 Impoundment Inspections
From
WWC Engineering
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First quarter 2005 inspections were performed on February 7, 2005. The entire site was <br />covered with 18 inches of snow. Check Dam #17 and Check Dam #19 have fabric showing in <br />spillway; however, all structures were functioning as designed. <br />Although the function of the check dams has been considered adequate, numerous check <br />dams require minor maintenance to restore the structures original design. The minor repairs are <br />noted below. These repairs will be made in the 2005 season, along with any other repairs identified <br />during 2005 site inspections. The first quarter 2005 impoundment inspection reports did not add any <br />maintenance tasks to this revolving list. <br />Repair <br />Item No. Location Work Description <br />1 CK-3 Embankment will be re aired at bypass of s illway <br />2 CK-4 Restores illway to eneral tra ezoid sha e <br />3 CK-5 Restores illway to eneral tra ezoid shape <br />4 CK-6 Restores illway to eneral trapezoid shape <br />5 CK-7 Restores illway to eneral tra ezoid sha e <br />6 CK-8 Restores illwa to eneral tra ezoid sha e <br />7 CK-9 Restore spillway to general trapezoid shape, restore embankrnent at bypass <br />of s illway <br />8 CK-10 Embankment will be re aired at bypass of s illway <br />9 CK-11 Restores illwa to eneral tra ezoid sha e <br />10 CK-12 Restore spillway to general trapezoid shape <br />11 CK-13 Restore spillway to eneral trapezoid sha e <br />12 CK-14 Restore spillway to eneral tra ezoid sha e <br />13 CK-15 Restores illway to eneral trapezoid sha e <br />14 CK-16 Restores illway to eneral tra ezoid sha e <br />15 CK-17 Restore spillway to general trapezoid shape, cover fabric in spillway exit <br />channel <br />16 CK-18 Restores illway to eneral tra ezoid sha e <br />17 CK-19 Cover fabric in spillway exit channel <br />18 CK-20 Exit channel repair <br />
The URL can be used to link to this page
Your browser does not support the video tag.