Laserfiche WebLink
~ III IIIIIIIIIIIII III <br />STATE <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80?03 <br />Phone: 13031 866-3 581 <br />FAX: (3031 866-3589 <br />Fupl/waterslale.co us/default.htm <br />RECE~`~~C <br />MAR 2 ~ 2QD1 <br />Division of Minerels and Geology <br />• <br />OF COLORADO <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 5 Water Commissioner <br />FROM: Claudia Engelmann, Water Resource Engineer G~ <br />DATE: March 20, 2001 <br />RE: Fredstrom Resources Pit, File No. M-2001-016 <br />Section 36, Twp 3 N, Rng 70 W, 6th P.M., Boulder County <br />Operator: Aggregate Industries, West Central Region, Inc. <br />Contact: Norm Roche, Manager <br />Aggregate Industries, West Central Region, Inc. <br />3605 S. Teller St. <br />Lakewood, CO 80235 <br />(303)985-1070 <br />pF' COQ <br />I Ner- <br />~~ <br />1976 ~• <br />Bill Owens <br />Governor <br />GregE Walther <br />Execmive Director <br />Hal D. Simpson, P E <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, <br />reclamation, ®water removed in the mined product, ®processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />