Laserfiche WebLink
Backfilling of Processing Waste <br />No processing waste exists for disposal at the carbon Junction Mine. <br />2.05.3(9) Undeground Development Waste <br />The Carbon Junction Mine will not produce any underground development waste. <br />2.05.3(101 Return of Coal Processing Waste to Abandoned Workings <br />The Carbon Junction Mine will not return any coal processing waste to underground <br />workings. <br />2.05.4 Reclamation Plan <br />No further coal mining will occur under this permit at the Carbon Junction Mine. At this <br />time the surface disturbance associated with the Carbon Junction Mine includes the North <br />and South Pit Drill Pad, the Permanently Reclaimed Spoils Area, the access road to and <br />through the mine site, the haul road to the North Pit, the sediment control system, <br />including diversion and conveyance ditches, the Carbon Junction Canyon diversion, <br />Sediment Ponds # 1 and # 2, the topsoil stockpiles, and Equipment Area, tke-multiple <br />r1 <br />U <br />This reclamation plan will address the reclamation of the remaining disturbances <br />associated with the Carbon Junction Mine. <br />2.05.4(21 Reclamation Plan Elements <br />The total disturbed area remaining at the Carbon Junction Mine to be reclaimed under this <br />permit is slightly over 37 acres. The approved post-mining land uses for the mine are <br />industrial and commercial, recreation, and residential. Oakridge Energy, Inc., is planning a <br />large development on the entire mesa, of which the Carbon Junction Mme constitutes only <br />a small portion. Goff Engineering of Durango has been retained by the landowner to <br />design the development and work with the appropriate agencies on securing all permits <br />requued. <br />The reclamation plan sepazately addresses the azeas to be reclaimed, 1) the North Pit; 2) <br />the haul road to the North Pit; the Permanentiy Reclaimed Spoils Area; 3}Topsoil <br />Stockpiles # 2, 4 ,7, 8; 4) reconstruction of Carbon Junction Canyon, 5) the South Pit <br />Drill Pad, and 6) Sediment Ponds 1 and 2. ACross-Section Map provides a comparison <br />between the existing and Srlal topography. The Final Contour Map shows the reclaimed <br />contours at a contour interval of two feet. <br />• <br />TROS, TRll(v1.0) 5-22 Revised 9/97, (1$/02 <br />