Laserfiche WebLink
TABLE OF CONTENTS <br />IContinuedl <br />Page <br />I, <br />DL -Disturbed Land (roads, oil well pad, pond embankment or <br />borrow areal 21 <br />W -Water 21 <br />Topsoil Salvage Techniques 21 <br />Topsoil Storage 25 <br />Topsoil Replacement 27 <br />Maintenance and Testing Procedures 31 <br />Literature Cited 33 <br /> LIST OF TABLES <br />Table No. Page <br />21-1 Soil Types, Proposed Topsoil Salvage Area (Life-of-Minel, <br /> Projected Topsoil Quantities, and Topsoil Limitations <br /> Within the Seneca II-W Mina and Tie-Across Haul Road <br /> Corridor, October 5990 9 <br />21-2 Annual Topsoil Salvage Volume by Soil Type through the <br /> First Permit Term 11 98 9-1 995), Seneca II-W Mine and Tie- <br /> Across Haul Road Corridor, October 1990 22 <br />21-2A Seneca II-W South Annual Soil Salvage Volumes <br />21-3 Topsoil Stockpile Inventory through the First Permit Term <br /> 11 98 9-1 99 51, Seneca II-W Mine and Tie-Across Haul Road <br /> Corridor, October 1990 26 <br />21-4 Topsoil Salvage and Replacement Schedule through the First <br /> Permit Term (1989-19951, Seneca II-W Mine and Tie-Across <br /> Haul Road Corridor October 1990 29 <br />21-4A Topsoil Salvage and Replacement Schedule - II-W South Extension Area <br /> LIST OF EXHIBITS <br />21-1 Topsoil Replacement <br /> <br />J <br /> <br />ii Revised 9l9B <br />