Laserfiche WebLink
(3) Boyd Lake, dam axis located in the SW 1/4 of Section 8, <br /> T 5 N. R 69 W, Priority No. 13 for 44,031 acre-feet by <br /> appropriation of 4/28/02, decreed 6-29-16, Boulder <br /> County District Court. <br /> b. One (1.0) right of Lake Loveland, dam axis located in the <br /> NW 1/4 of Section 14, T 5 N, R 69 W, Priority No. 9 for 14,239 <br /> acre-feet by appropriation of 1/14/93, decreed 6-29-16, <br /> Boulder County District Court. <br /> C. Three and one-quarter (3 1/4) shares of the capital stock <br /> of the Seven Lakes Reservoir and Irrigation Company. Reser- <br /> voirs in the system are located northeast of Loveland and <br /> together comprise Priority No. 12 for 8432 acre-feet by appro- <br /> priation of 4/28/02, decreed 6-29-16, Boulder County District <br /> i <br /> Court. <br /> 3. PLAN FOR AUGMENTATION AND PLAN FOR OPERATION: <br /> a. Applicant owns a 75-acre parcel of land located in the NE 1/4 <br /> of Section 2, T 5 N, R 66 W, located northwest of Greeley, <br /> Colorado (presently the site of an .asphalt plant, an open pit <br /> gravel extraction process and irrigated croplands) . Applicant <br /> i <br /> intends to utilize the parcel for a gravel mining operation <br /> and to extract remaining gravel from the land by a dry- <br /> process, open-pit procedure extending over approximately 20 <br /> to 25 years. <br /> J <br /> b. The process will consist of two steps for each individual <br /> pit site within the 75-acre parcel. The first step for each <br /> pit will be extraction of the portion of the gravel above <br /> the water table during which time de-watering will not be <br /> required. The second phase will consist of de-watering the <br /> pit by means of a cutoff trench around the pit with the <br /> drainage water being diverted from .the site in either of <br /> two ways: <br /> (i) Pumping into the storm sewer of the City of Greeley <br /> 2 <br />