Laserfiche WebLink
<br />E~~A <br />S Coal Company <br />I~~ I~II~~I~~IIIII~I <br />Seneca Coal Company <br />~cr.FlvEp <br />DEC 13 1995 <br />Oiyision of n~~nera~s ~ ~cc,~cSv <br />Ms. Janet Binns <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />December 7, 1995 <br />RE: Quarterly sedimentation Pond inspections - Seneca II Mine <br />Dear Ms. Binns: <br />Enclosed is the fourth quarter inspection reports for Ponds 002, <br />003, 004, 008, the PeCoCo Reservoir, Spill Control Pond #2 and <br />both truck wash ponds at the Seneca II Mine. All conditions <br />appeared stable and acceptable. <br />If you have any questions, please call me. <br />Sincer <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />~ ~ _~~ <br />Micha A• Al <br />Engine -._ <br />P.E. <br />DEC 0 71995 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />