Laserfiche WebLink
15. 6.3.3 EXHIBIT C -MINING PLAN <br />This presents the mining plan for Glacier Peak Mining on eight proposed, approximately 1 /8 acre sites <br />between summer 2003 and 2018. <br />6.3.3 (1) (a) Promised excavation and reclamation schedule: (Reference Exhibit E for site locations). <br />SITE A (Smoky Hawk) planned excavation 6,000 sq' maximum <br />summer 2003: 2,500 sq' excavated with 1,000 sq' reclaimed <br />summer 2004: 2,500 sq' excavated with 3,000 sq' reclaimed <br />eazly summer 2005: 1,000 sq' excavated with 2,000 sq' reclaimed (site completely reclaimed) <br />SITE B (Elk Horn), planned excavation 5,000 sq' maximum <br />late summer 2005: 2,000 sq' excavated with 1,000 sq'reclaimed <br />summer 2006: 2,000 sq' excavated with 2,000 sq' reclaimed <br />early summer 2007: 1,000 sq' excavated with 2,000 sq' reclaimed (site completely reclaimed) <br />SITE C (Smoky Hawk), planned excavation 6,000 sq' maximum <br />late summer 2007: 2,000 sq' excavated with 1,000 sq' reclaimed <br />summer 2008: 3,000 sq' excavated with 3,000 sq' reclaimed <br />eazly summer 2009: 1,000 sq' excavated with 2,000 sq' reclaimed (site completely reclaimed) <br />SITE D (Elk Horn) planned excavation 6,000 sq' maximum <br />Late summer 2009: 2,000 sq' excavated with 1,000 sq' recL~imed <br />summer 2010: 3,000 sq' excavated with 3,000 sq' reclaimed <br />early summer 2011: 1,000 sq' excavated with 2,000 sq' reclaimed (site completely reclaimed) <br />SITE E (Blue Smoky) planned excavation 6,000 sq' maximum <br />late summer 2011: 2,000 sq' excavated with 1,000 sq' reclaimed <br />summer 2012: 3,000 sq' excavated with 3,000 sq' reclaimed <br />eazly summer 2013: 1,000 sq' excavated with 2,000 sq' reclaimed (site completely reclaimed) <br />SITE F (Blue Smoky) planned excavation 6,000 sq' maximum <br />late summer 2013: 2,000 sq' excavated with 1,000 sq' reclaimed <br />summer 2014: 3,000 sq' excavated with 3,000 sq' reclaimed <br />early summer 2015: 1,000 sq' excavated with 2,000 sq' reclaimed (site completely reclaimed) <br />SITE G (WOLF FANG) planned excavation 5,000 sq' maximum <br />late summer 2015: 2,000 sq' excavated with 1,000 sq' reclaimed <br />summer 2016: 2,000 sq' excavated with 2,000 sq' reclaimed <br />eazly summer 2017: 1,000 sq' excavated with 2,000 sq' reclaimed (site completely reclaimed) <br />SITE H (QUI-BUC NO. 2) planned excavation 6,000 sq' maximum <br />late summer 2017: 3,000 sq' excavated with 2,000 sq' reclaimed <br />summer 2018: 3,000 sq' excavated with 4,000 sq' reclaimed (site completely reclaimed) <br />