Laserfiche WebLink
Mined Land Reclamation Board <br />c/o Ms. Kate Pickforcl <br />September 24, 2003 <br />Page Two <br />1. Perform a 24 month groundwater study, as opposed to a 12 month study. (3(a)) <br />The identified trigger point must be 2 feet or less. <br />2. To install the equalizing pipeline prior to the installation ofthe slurrywall. (3(b)) <br />3, To relocate well no. 50354-F. (3(c)) <br />4. To deliver surface water to the Windells in the event water levels drop belowthe <br />trigger point identified in the 24 month study. (4(a)). <br />5. To compensate the Windells if all mitigation measures fail. (4(b)). <br />6. To plant wetland vegetation on the shores of the pit. (5(a)). <br />7. To include weed control and watering in the seeding plan (5(b)). <br />8. To include cool season grasses in the planting mix. (5(c)). <br />9. To increase the seeding rate to 40 lbs. pls per acre. (5(c)). <br />10. To eliminate berms, where practicable, on the North side of the properly as soon <br />as possible. (5(d)). <br />11. To identify the number, location and species of planned tree plantings. (5(e)). <br />Thank you for facilitating a resolution of this objection. <br />Sincerely, <br />LIND, LAWRENCE & OTTENHOFF, LLP <br />P. Andrew Jones <br />PAJ:mt <br />cc Neil and Laura Coyle <br />Robert and Lavenia Temmer <br />Aquatic and Wetland Company (via fax) <br />Robert Bruce, Esq. (via fax) <br />F:~PMCOVLEIPICI0=0RD 030924.DOC <br />ZOOf~j 0~'I'! TTTT 95C OLB %V3 Z4~80 08A1 CO/VZ/60 <br />