Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />l~fachine Total Fleet Size Haut Trfp Retum Trip <br />Descriptbn st/hour/unit I (NO. units) I CosUhr/fleet I CosUhr/fleet <br />-Light Duty Pickup, 4x4, 3/4 T. $46.30 1 $46.30 $46.30 <br />-Fuel Tankei 4x2, 170 HP $64.11 1 $64.11 $64 1 f <br />-Luba Truck, 4x2, 170 HP $72.01 1 $72.01 $72.01 <br />Subtotals <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area vegan : Sterling <br />Trensoortation Cvcle Time : Nan- Total one-way travel distance : 15.0 miles <br />Roadable Roadable Average travel speed : 55.0 mph <br />Haul Ume (hours) = 0.27 0.27 <br />Retum time (hours) = 0.27 0.27 <br />Loading Ume (hours) = 1.00 NA <br />Unloading time (hours) = 1.00 NA <br />Subtotals = 2.55 0.55 <br />Total non-roadable mob/demob cost' <br />'two muM bps wNh haul rig <br />Total roadable mob/demob cost" <br />^ one round trip, no haul rig <br />$3, 724.95 <br />$99.50 <br />JOB TIME AND COST Total job time : 5 09 hours <br />Total iob cost : 53.82Q <br />