My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71223
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:32 PM
Creation date
11/20/2007 11:45:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 13 SEDIMENTATION PONDS HYDROLOGIC INVESTIGATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-13- <br />• results of the sedimentation analysis are summarized in LRCWE Table 3, <br />Required Sediment Storage Volumes. LRCWE Plate I, Sedimentation Ponds, <br />Energy Mines No. 1 and 2, and Eckman Park sets forth the pond volume for <br />each site. The pond volume includes the required sedimentation volume and <br />the routed 10-year 24-hour inflow flood. <br />FLOOD ROUTING <br />The flood routing for all ponds except A assumed an initial water surface <br />at the required sedimentation level. This is the elevation of the lowest <br />set of holes in the riser pipe. For Pond A, a permanent pool elevation of <br />slightly more than the required sedimentation level was assumed because the <br />reservoir will also store 27 acre-feet of irrigation water. Section 816.46 <br />(h) requires that the reservoir be cleaned when the sedimentation reaches <br />60% maximum of the required sedimentation volume. However, after the first <br />significant inflow, a permanent maximum pool elevation equal to the required <br />• sedimentation level will develop as this is the elevation of the lowest set <br />of holes on the riser. <br />Actual flood routings were computed for the 10-year, 100-year and Pty inflow <br />floods for Pond A, and the 10-year floods for Ponds D, E, F, and G. The <br />actual flood routings for the 10-year floods for these reservoirs were used <br />to determine the elevation of the crest for their risers. All of the other <br />ponds have a Type 3 riser which limits the outflow rate to such an extent, <br />that the entire 10-year inflow volume was assumed to be stored for the pur- <br />pose of setting the riser elevation. To confirm this assumption the 10-year <br />24-hour inflow flood was routed for Pond K. <br />INTERCEPTOR DITCHES <br />Interceptor ditches were used to modify the natural tributary areas to var- <br />ious ponds in order to maximize the use of favorable ponding locations. The <br />ditches are located in plan view on Energy Mines No. 1 and 2 Hydrology (EFC <br />. Map 13). They are identified with '_etters which correspond to the pond <br />Leonard Rice Consulting Water Engineers. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.