My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71207
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:32 PM
Creation date
11/20/2007 11:45:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
10/31/2005
Doc Name
24 Head Gate Well Project Plan
From
24HG2E27XC
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR320
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24HG2E27XC Sample Hole(s) Project Plan <br />Minor Revision 320 <br />Page 7 of 11 <br />PROPOSED ACCESS ROUTES <br />The access route for these wells will be via the road leading to the 14-04 MDW (West <br />Flat Iron). This road alignment is depicted on the attached map <br />PRE-DRILLING ACTIVITIES <br />Construction and drilling activities will be supervised by a project representative of <br />Mountain Coal Company, L.L.C. Any significant proposed changes in the project after <br />permit approval would be reviewed with the appropriate regulatory agencies before <br />changes take effect. <br />Staging areas to be used by the drilling contractor will be used in a manner to minimize <br />damage to the vegetation. Any surface disturbance to these sites will be re-graded and <br />seeded to promote rehabilitation. <br />Access routes will be maintained to accommodate full sized 4X4 pickup trucks, ATVs, <br />and required drilling equipment, including but not limited to the following: truck <br />mounted or skid mounted drill rig, air compressors and\or booster, rig-up truck, portable <br />water tanks, boom truck, utility trailer, drill pipe lay-down rack, and crew trucks. <br />Roads utilized in the project will be maintained with water bars and appropriate <br />sedimentation controls as required during the drilling phase. A D4 bulldozer or its <br />equivalent will be used to prepare the road for travel and assist in mobilizing the drill <br />equipment to the drill sites. Additional equipment expected to be used in opening, <br />maintaining, and reclamation may include arubber-tired backhoe, rubber tired grader, <br />roller compactor and atrack-mounted excavator. <br />Brush removal may occur at the proposed drill sites however, if trees are encountered, <br />MCC will remove the trees. A drill site pad of approximately 150 ft, x 150 ft. will be <br />constructed to accommodate the drill equipment and drill cuttings sump or mud pits. <br />Drill pads will be constructed only as large as necessary. <br />Topsoil will be stripped, stockpiled, and identified with a sign. Stored topsoil will be <br />placed in a separate pile; the pile will be located outside of drainages and placed in an <br />area where it will be protected from wind erosion; signs identifying the pile as "Topsoil" <br />will be placed so as to prevent unintended contamination, compaction or use for other <br />than reclamation purposes; alternate sediment controls (slash, silt fence or straw wattles) <br />will be used; and the pile will be seeded in the first seeding season following its <br />construction using a seed mix that will stabilize erosion. This topsoil will be used in the <br />reclamation phase of the program. <br />Mud pits to accommodate drill cuttings will be constructed with an approximate size of <br />10' x 20' x 6'. These mud pits will be cut into the native soil azea of the pad if possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.