My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71195
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:31 PM
Creation date
11/20/2007 11:44:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05.4(2)(g) SEALING OR MANAGING MINE OPENINGS EXPLORATION HOLES OTHER BOREHOLES OR WELLS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />iii ii~riiriii~i~r~i <br />Doc Date:12M1/2001 <br />5~~ <br />« 2.05.4 2 Sealin or Nana in Nine 0 enin s Ex loration <br />Holes, Other Boreholes or Wslls ~~ <br />- - ---- <br />-- --- - -- <br />Permanent seals of mine openings will consist of 26 ft. <br />non-combustible material pushed into and filling the min• <br />opening. See Exhibit W. In the case of the partial removal of <br />the underground drift labeled '1961 Opening', found in the Phase <br />2 pit, which is seeping ground water through a plastic pipe at <br />the portal the source of the ground water will be sealed by <br />cement, or a shale cover, if found in the pit area. Otherwise, <br />as the drift enters the highwall a permanent seal of shale will <br />placed 1n the drift to stop the flow of water. <br />• <br />Drill hole 29-4, the monitor well, will have a cement cap <br />placed in the well extending from the bottom at 200 feet to 20 <br />feet above the level where water was initially encountered which <br />was at 83 feet. The cement plug will be from 63 to 200 feet. <br />Drill hole 29-8 was improperly plugged at the completion of <br />Notice of Intent X-87-202-00 resulting in a 10 foot cement plug <br />not being placed in the hole from 55 to 65 feet. See Exhibit <br />PP. When this drill hole is uncovered during the Phase 2 <br />mining operation the hole will be reamed and the additional plug <br />inserted at the proper interval. The surface cap will also ba <br />properly re-installed before reburial. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.