Laserfiche WebLink
s ~ iii iiuii-iii-ii-ii <br />? sss <br />CAMP BIRD COLORADO INC. <br />, <br />~-~-- <br />(Subsidiary of Federal Resources Corporation) a s'~~>::,,, <br />Camp Bird Mine Ouray, Coforado 81427„ ,, <br />T_.__~_ ,~ ~,G~ <br /> <br />/" <br />l\ ~ ~. , <br />~'~:~~ <br />`, <br />January 29, 1986 <br />Colorado Dept, Of Health <br />4210 East 11th Avenue <br />Denver, Co. 80220 <br />Attn: Sandy Squire <br />i <br />RE: Federal Resources Camp Bird <br />CDPS I70: CO -0026981 <br />Dear Sirs: <br />This letter is in <br />regarding changes <br />figuration, <br />"$a ~~°I o <br /> <br />X986 <br />.,.~ ~ :. <br />'~': <br />... , <br />response to your January 14, 1986 letter <br />made in Camp Bird's discharge flow con- <br />There have been no changes made in our flow configuration <br />at this time. Discharge Points 001, 002, 003, and 004 <br />remain in their same respective locations (see enclosed <br />map), The construction of the northeast tailings pond <br />extention has resulted in a seep water berm and evaporation <br />pond. The net effect of the construction will. be the <br />discharge from outfall 003 will flow into the evaporation <br />pond. Since we have not discharged from outfall 003 for <br />10 years we do not anticipate any problems from this change, <br />The separate matter of the weir configuration of outfalls <br />001 and 004 being unlevel and not having sharp crests is <br />being addressed at this time, Sharp level crests will be <br />installed within the next 30 to 60 days, <br />We are now planning a settling pond to combine outfalls <br />001 and 004 (see enclosed map for location of proposed <br />{ pond site). In addition we wish to move the 003 outfall <br />j location . <br />Our present plan calls for the construction of a pond in <br />the general vacinity of the present 004 outfall, The <br />present discharge from*outfall 001 will be piped to the <br />pond for settling and then discharged to the newly located <br />004-001 combined outfall. <br />The new 003 outfall location <br />evaporation pond berm, It is <br />discharge will occur from .003 <br />pond should fill . <br />_ ~~ ~,:,5~ .. <br />will be located high on the <br />not anticipated that any <br />unless the evaporization <br />