Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Technical Revision 47 <br />Task description :Replace Topsoil from Stockpile to Hubbard Creek Vent Shaft Pad <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership wst/hour : $72.92 NA <br />Operating wsUhour : $98.84 100 <br />Ripper op. cest/hour : $0.00 0 <br />Operator cosf/hour : $32.78 NA <br />Total unit cest/hour : $204.53 Total fleet cost/hour : $204.53 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,450 BCY factor : 1.250 volume : 1,812 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (I <br />Average site altitude : 7, 500 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Ea Rh -Dry packed <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />Adjusted unit production : 504.38 <br />Adjusted fleet production : 504.38 <br />Source <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.59 Hours <br />Unit cost : $0.406 /LCY Total job cost : $735 <br />