Laserfiche WebLink
<br /> <br />Mining Plan <br />Exhibit B: <br /> <br />Sand and gravel will be extracted with the use of dozers, scrapers, <br />wheel loaders, and trucks. A crusher or screening plant will not <br />be used. <br />The mining will begin at the southeast corner of the proposed site. <br />We will work in a northeasterly direction. The topsoil will be <br />pushed into a terrace o~-~ the uphill side to protect the pit from <br />off-site drainage. The gravel will be pushed downhill and loaded <br />from the west side. <br />The gravel deposit is fairly thick. We would like to strip approx- <br />imately 20 feet of material off this site. Because of the steepness <br />of this side hill, we will stair step our way up the side. <br />