Laserfiche WebLink
<br />Subsidence Monitoring Plan (continued) <br />• One (1) year of baseline data will be recorded <br />before commencement of commercial <br />operations <br />• Monitor subsurface movement by use of time <br />domain reflectometry (TDR) as part of the <br />~ production well(s) completion <br />• If TDR is unsuccessful, geophysical logs <br />would be conducted in a monitoring well <br />located within the panel 7 <br />