Laserfiche WebLink
A soil depth map, Figure 4.7-1, delineates the available depth of topsoil (inches) <br />for each map unit. The soil depth suitable for stripping and reclamation use has been <br />determined through evaluation of topsoil material by horizon as presented in Soils <br />Assessment, Munger Canyon Permit (WRDC 1980a). <br />3.2.2 Volumes of Topsoil Available for Reclamation <br />The volume of topsoil available for reclamation is in the topsoil stockpile located <br />below the proposed waste rock disposal area. (Figure 2.2-1 ). This topsoil pile contains <br />about 1200 cubic yards which is sufficient to cover approximately 1.5 acres 6-inches <br />deep. This topsoil will be trucked to the mine site where it will be spread approximately <br />6-inches thick. There are approximately 1,400 cubic yards of topsoil type material <br />stored at the mine site. This is the amount remaining after some of the material was <br />used to cover the coal hauled from the Loma Loadout. These topsoil volume figures <br />are obtained from recent (2001) digital contours. <br />• The topsoil to be salvaged in the sediment pond and waste rock disposal areas <br />are explained in section 2.2.5. This topsoil will be utilized for the reclamation of the <br />waste rock disposal area. <br />3.2.3 Topsoil Storage <br />Two topsoil storage areas will be located in the vicinity of the waste rock disposal <br />area (Figure 2.2-1 ). Vegetation will be stripped from the storage areas prior to <br />stockpiling. The design and management of topsoil stockpiles is addressed above. <br />During storage, the topsoil stockpile will be stabilized with a perennial <br />vegetational cover resulting from drill seeding of 5 Ibs/ acre Western Wheatgrass- <br />Arriba, 5 Ibs/acre Streambank Wheatgrass-Sodar, and 5 Ibs/acre Thickspike <br />Wheatgrass-Critana. Weed cover will be controlled via the most appropriate technique. <br />Control of weeds in the topsoil will decrease potential problems of weeds competing <br />with species of revegetation mix after the topsoil is re-spread. <br />• Permit Renewal 3-5 08/03 <br />