Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM , <br />POnd NEW ELK M NPDE$ Np, CONTAINMENT lfl <br />Date of Inspection /,/~ ~7 , l SS6 ' <br />ENBANICNENT <br />1. Adequacy of the vegetative cover: xcelient Noderate, Few, Pooz <br />2. Erosion forming gullies: Extensive, .Bose, Very Few, !tone; <br /> <br /> <br />'t*;. <br />~.~' .. <br />3. is wave action cnusing erosions <br />On the upstream embankment? Yea No~_ <br />At the principal spillway inlet? Yea No~_ <br />4. Erosion of the downatreem toe of the embankment? Yea No,~,_ <br />The cause of the erosion is attributed to: <br />5. is seepage occurring through the dam? Yee No ~ If es <br />could this seepage cause potential inatnbility7 Yes No~ <br />Explain: <br />~tINCIPAL SPILLMA! <br />1. Ia the principal sp111way system in working order? Yea,~_No <br />2. Is the inlet free of debris and restrictive material?Yes ~ No <br />3. Ia the discharge outlet free of restrictive material? Yes ~ No <br />4. Is erosion occurring at the discharge outlet? Yes No ~ If <br />yes, . <br />evaluate the severity: Extensive. Moderate Just atnrtinq None <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yea~_No <br />2. Does it appear as if the emergency'spillway has discharged water <br />since the last inspection? Yes No ~ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yea No_~_ Describe the <br />extent . <br />SEDIMENT STORAGE CAPACITY <br />1. Has the desi n storage capacity of <br />Yes No~ Ii yes, <br />explain: <br />the reservoir been surpassed? <br /> <br />Plense add any.specinl convents concerning potentially dangerous <br />problems on the back o! this sheet. <br />Inspector <br />