Laserfiche WebLink
1 <br />RECEIVED <br />DEC 1 82400 <br />~„ Div'y ~' of. Minerals and Geology <br />• 1 KAPPER MINING INC. <br />CRAIG, COLORADO <br />DAM CONSTRUCTION CERTIFICATION <br />Horse Gulch Dam <br />• <br />I, James M. Mattern, a Registered Professional Engineer in the State of Colorado, in <br />accordance with 2CCR407-2, Section 4.05.6(10), certify that Horse Gulch Dam was <br />constructed under my direct supervision. Construction activities commenced with <br />brushing and topsoil stripping on June 21, 2000 and ended with an inspection of the <br />spillway and outflow channel on October 23, 2000 <br />During construction the site was inspected to insure conformance with standazds and <br />practices detailed in our approved permit. An as-built survey is the basis for results <br />shown on the attached SEDCAD3 output. Construction methods and as-built model <br />results meet the requirements of Section 4.05.6. <br />lames M. Mattern <br />CO PE 20537 ~? 20537 <br />/Z~iz/J v <br />Date <br />/L1R -l7Fl DEC 2 12000 <br />