Laserfiche WebLink
Civil Software Design -- SEDCAD+ Version 3.1 <br />Copyright (C) 1987-1992. Pamela J. Schwab. All rights reserved. <br />Company Name: <br />Filename: C:\SCAD\DT\B; <br />Date: <br />SAE DEMO FOR CONTAMINATED <br />Storm: 3.40 inches, 25 <br />Hydrograph <br />Greystone Development Consultants <br />>,SIN\OILTSSAE User: C.W. BEGEJ <br />10-15-1993 Time: 12:13:06 <br />TOPSOIL AWAITING REMEDIATION-25-YR 24-HR BRM <br />year-24 hour, SCS Type II <br />Convolution Interval: 0.1 hr <br />SUBWATERSHED/STRUCTURE INPUT/OUTPUT TABLE <br />-Hydrology- <br />JBS SWS Area <br />(ac) <br />-------------------------- <br />-------------------------- <br />111 1 0.02 <br />Type: <br />111 Structure 0.02 <br />Base- Runoff Peak <br />CN UHS Tc K X Flow Volume Discharge <br />(hrs) (hrs) (cfs) (ac-ft) (cfs) <br />---------------------------------------------------- <br />---------------------------------------------------- <br />82 M 0.004 0.000 0.000 0.0 0.00 0.04 <br />Null Label: CONTAM SOIL SAE <br />0.00 <br />111 Total IN/OUT 0.02 0.00 0.04 <br />f~J <br />Contaminated soil will be consolidated into a circular pile with a radius <br />less than or equal to 17'. and a perimeter of 107'. A triangular ditch with 2.5:1 an.' <br />3:1 sideslopes will contain .00378 ac-ft of storage with a depth of 0.75'. <br />The berm will be 1.75' to allow 1' of freeboard to ensure compliance with Rule <br />4.05.6(11)(e). Specific calculations follow. <br />The dirt pile requires 0.0028 acft of storage from the following calculation: <br />3.4" of precipitation generates 1.7" runoff/inch precipitation at a CN of <br />82. <br />_ 1.-7"/12" x .02 acres =-0.02833 ac-ft ~ _ __ _--- <br />The ditch at 0.75' depth holds 0.00378 ac-ft. <br />0.5 x 4.125' (top width) x 0.75' (depth) x 107' (perimeter) = 0.00378 acft <br />43560ft2/acre <br />• <br />