Laserfiche WebLink
L- <br />6800 <br />RUCT <br />BETWEEN THESE <br />�y <br />GR <br />�p�51pN <br />NOTES <br />LEAVE 15' OFER SPACES <br />ALONG CREEK PER TYPICAL <br />SECTION, Sn 5 OF 5 <br />1. WASTE PILE OUTLINES SHOWN ARE APPROXIMATE. <br />RECLAIMED PILE CONFIGURATION SHALL BE CONSTRUCTED <br />TO HAVE THE FOLLOWING CHARACTERISTICS: <br />A. MAXIMUM SLOPE 2:1. <br />B. SLOPE TOP AT I% MAXIMUM. <br />2 CONSTRUCT ENERGY DISSIPATION STRUCTURES a <br />COVER PILES WITH TOPSOIL PER DETAIL HEREON. <br />PER <br />NbwfA <br />s <br />M <br />m <br />PLAN <br />1 " =50' <br />MIN. <br />AP OXIMATE -OU <br />OF RECLAIMED P <br />6T�0 <br />CO CT SHEE <br />DI SSIPATO <br />PER DETAILS SHT. 4 <br />FERGY <br />POINTS <br />;Z WASTE ROC DGE BERM <br />)GES OF WASH PILE <br />L HEREO <br />E15S1 G / <br />SPILLWAI <br />SECTION <br />0 <br />rB <br />GULCH ENERGY D I SS I PATOR <br />PLAN <br />1" = 10, <br />TOPSOIL COVER /-SPILLWAY CREST <br />WASTE ROCK <br />ti <br />PROFILE <br />1 1 <br />GULCH INVERT <br />EXCAVATE TO BEDROCK <br />© SECTION AT CREST <br />o <br />oU 6 MIN. TOPSOIL <br />N <br />w <br />a <br />2 Q <br />> 10, 1 <br />MCDERMID ENGR. ASSOC. INC. <br />TERRACE & EDGE BERM GEO -HYDRO CONSULT,INC. <br />NO SCALE <br />IProj. No. 009 -009 <br />6 <br />'UL 1 51983 <br />MINED LAND RECLAMATION <br />Colo. Dept. of Natural Resources <br />COTTER CORPORATION <br />SCHWARTZWALDER MINE <br />WASTE PILE RECLAMATION <br />RECLAIMED CONFIGURATION <br />EAST PILE <br />SCALE DATE SHT. N0. <br />111 = 501 6/30/83 3 of 5 <br />1IIIllIIIZO48411/1111II <br />