Laserfiche WebLink
P. 1 <br />* lE lE COMMUI~ITION RESULT REPORT ( RUG. 4.199:41PM ) ~ <br />TTI DIViMINERRLS&GEOLOGY <br />FILE MODE <br />198 MEMORY TX <br />OPTION <br />RERSON FOR ERROR <br />E-1) HRNG UP OR LINE FRIL <br />E-3) NO RNSWER <br />ADDRESS (GROUP) <br />19702856393 <br />RESULT PRGE <br />--------------------- <br />OK P. lit <br />E-2) HUSY <br />E-4) NO FRCSIMILE CONNECTION <br />GT~~ n~ rl~ 2AT~Q <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 5t., Room 215 <br />Denver, Colorado 80203 <br />Phone:1303) 866-3567 <br />FA%: (303) 832.8106 , <br />Post-iY Fax Note 7871 pat° ~rf ~ pNa°oa,- / <br />To A.1C L1Mq, E From ~ b f~5 <br />CoJDept Co. <br />Phone Y Phone Y <br />Faa Y/ 7p~ Fex iF <br />MEMO TO FILE <br />File No.: M-99-002 <br />Operator: American Soda, L1.P <br />Date: July 21, 1999 /~ <br />Specialist: Allen Sorenson I'[t, <br />Subject: Ground Water Moni oring Wells <br />Type of Interaction: phone <br />Persons Contacted and Affiliation: Max Ramey, American Soda and Paul Daggett, BL,Ni <br />DIVISION OF <br />MINERALS <br />~. <br />GEOLOGY <br />tRy1NING SAFETY <br />alll Owens <br />Governor <br />Greg E. Walrher <br />Exceutlve D~rectw <br />Michael E, l on6 <br />bivl7lon Director <br />A discussion was held of problems with the installation of ground water monitoring wells and the <br />initiation of the Bound water moltoring plan. The following list surgmazizes the discussion and the <br />possible resolution of each issue discussed. <br />1. The Uinta completion on we1121 ~1 suffered a casing failure and will be replaced with a single <br />completion monitoring well at the same location. A sample will be collected prior to 8/1/99... <br />2. The driller inadvertently cemented through the B-Groove completion in well 29-4. American Soda <br />.-- ....n n e. .. r n--...... +...~:~,~r:nn onrl Grill r•nllrrtt rhP 7/99 samnle from this <br /> <br />