Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />E~~A <br />SCoalCompeny Seneca Coal Company <br />RECEIVED <br />DEC 0 61999 <br />Division of Minerals & Geology <br />November 30, 1999 <br />Ms. Sandra Brown <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Pond Inspections - Seneca II-W Mine <br />Dear Ms. Brown: <br />Enclosed is the third quarter inspection reports for Ponds 005, <br />006, 009, and 015 at the Seneca II-W Mine. The construction of <br />pond 015 has been completed. The as-built survey has been <br />conducted and the accompanying as-built report is currently <br />being prepared and will be forwarded shortly to the Division for <br />inclusion in the permit package. Conditions appeared stable and <br />acceptable. <br />If you have any questions, please call me. ~_~=;,~• <br />~~C }~~9 <br />Michae ~.\Al <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />', P.E. <br />NOV 3 0 1999 <br />Seneca Coal Company • P.O. Drawer D • Hayden. Colorado 81639 <br />Telephone (970) 276.9707 • FAX (970) 276-3014 <br />