My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70980
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:19 PM
Creation date
11/20/2007 11:38:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
Permit File
Doc Date
5/10/2005
Doc Name
CDOT Objection Letter
From
Civil Resources LLC
To
CDOT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />CIVIL RES-AU RCES, LLC <br />May 6, 2005 <br />~~~~"rz`~?G . <br />MAT i Q 2005 <br />Colorado Department of Transportation pivisian of P.;;:;cz_.. °: rs ~:ir <br />Mr. Joe Intermill <br />43379 Highway 51 <br />Ault, CO 80610 <br />RE: SW TKO Joint Venture, LLC, Division of Minerals and Geology Application M•2004-079' <br />Lupton Lakes Resource; CDOT Objection Letter - Dewatering <br />Dear Mr. Intermill: <br />This letter is being written to present new and confirm previously presented information regarding your <br />concern with respect to passage of water through the Highway 65 right-of-way. Following is the excerpt <br />from your letter regarding the use of the existing structures to convey water to the South Platte River and a <br />brief chronology of communications with CDOT staff and consultants: <br />CDOT Comment 1: <br />Please clarify the points of discharge for wafer that is dewatered to facilitate mining and reclamation plan. <br />CDOT is concerned if the structures under Highway 85 are adequate to handle the flows from pit <br />dewatering. Please demonstrate that the outlet structures (such as ditches, culverts, pipes, etc.) are <br />adequate to handle the flaws from water discharged off-site. <br />Applicant Response 1: <br />The total conveyance capacity requirement at each seepage ditch crossing was estimated by the applicant <br />by adding the 100-year peak runoff rate to the maximum mine dewatering discharge rate. The applicant <br />completed hydrologic calculations to estimate 100.year peak storm runoff discharge rates that would be <br />tributary to each proposed discharge site. The Ogilvie Seepage Ditch crossing peak discharge was <br />calculated to be approximately 78 cfs with a time of concentration of 27 minutes and basin area of <br />approximately 180 acres. The peak storm runoff rate to the Porter Seepage Ditch crossing was estimated <br />to be slightly higher at 87 cfs due to a slightly larger tributary basin area of 200 acres. The applicant <br />proposes to add 45 cfs (and more typically 10 cfs) to this flow for 123 cfs and 132 cfs at the Ogilvie or Porter <br />Seepage ditches respectively. <br />The hydraulic capacity of the conveyance structures at both discharge locations was subsequently <br />calculated. Two culverts exist at each proposed dewatering discharge site. The proposed discharge points <br />are shown on Figure 1. The south discharge location (Porter Seepage Ditch, see Photos 1 and 2) has an <br />8-foot high by 8-foot wide concrete box culvert and a 24-inch diameter reinforced concrete pipe. The <br />approximate capacity of the 24-inch culvert is 30 cfs and the box culvert capacity is approximately 500 cfs <br />for a total of 530 cfs. <br />(~ -~~c ~1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.