Laserfiche WebLink
... <br />Flood Hazard Development <br />Permit Certification <br />Page 2 <br />r~ <br />Sourc• of Information: <br />X All nev or replacement domestic rater rolls or rater supply, treatment, or <br />storage ayatems era daaigned to prevent inundation or infiltration of <br />floodwater into the system by an intermediate regional flood. <br />~_ All nev or replacement sanitary sever systems era designed to prevent <br />inundation or infiltration of floodwater into the system and to prevent <br />discharges from the systems into the floodwater of an intermediate regional <br />flood. <br />~_ The encroachments, including fill, new construction, substantial <br />improvnments, and other development shall not result in any increase in <br />flood levels during the occurrence of an Intermediate Regional Flood. <br />_ Electrical, heating, ventilation, plumbing, and air-conditioning equipment <br />and other service facilities rill be designed and/or located •o as to <br />prevent water from entering or accumulating rithin the components during <br />conditions of flooding. <br />_ All nev construction and substantial improvements will be constructed using <br />methods and practices that miniaiza flood damage. Improvements rill ba <br />constructed with materials and utility equipment resistant to flood damage. <br />All nev construction and aubatantial improvamanta rill De anchored to ., <br />prevent flotation, collapse or lateral movement of the structure and to <br />rithsund hydrodynanle loads. <br />, <br />The proposed use or structure is to ba located Ln the FU1 (Floodvay) <br />r- DSstriet,...and when built rill not cause any increase in floodvaces levels <br />during an Intarsediate Regional Flood and will not limit or restrict the <br />floe capacity of the floodvay. <br />~_ Fill material rill be used !n the FP-1 or FP-2 (Floodptone) Districts, and <br />the fill material is designed to rithstand the eroslonsl forces associated <br />rich an Intermediate Regional Flood. Stockpiles are not considered <br />fill for purposes of this permit. <br />NOTt: Stockpiles mill be formed, but are temporary. Berms anc <br />stockpiles will be composed of toasoil, overburden, and <br />grave] products. <br />Fill will be used on the concrete batchinF plant. <br />Fill will be used for ramps up to scale. <br />