Laserfiche WebLink
SEDCAD 4 for Windows <br />Co01^ight 1999 Pamela J Schwab <br />CrvJ Software Design <br />w/o Freeboard w/ Freeboard <br />• Froude Number: 1.98 <br />Structure #3 (Pond1 <br />n, coal, slope <br />Pond Inputs: <br />Initial Pool Elev: 6,636.00 <br />Initial Pool: 1.34 ac-ft <br />'Sediment Storage: 1.54 ac-ft <br />Dead Space: 20.00 <br />#Sediment capacity based on Average Annual R of 70.0 for 2 year(s) <br />Perforated Riser <br />Riser Riser Height Barrel Barrel Barrel Slope Number of <br />' <br />Diameter (ft) Diameter Length (ft) (%) Manning <br />s n Spillway Elev Holes per <br />(in) (in) Elev <br />12.00 6.00 8.00 80.00 3.00 0.0240 6,638.00 4 <br />Emergency Spillway <br />• Spillway Elev Crest Length Lek Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />6,640.00 10.00 2.50:1 2.50:1 2.00 <br />Pond Results: <br />Peak Elevation: 6,639.11 <br />H'graph De[ention Time: 8.28 hrs <br />Pond Model: CSTRS <br />Dewa[er Time: 6.09 days <br />Trap Efficiency: 90.73 <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />• <br /> Area Capacity Discharge Dewater <br />Elevation Time <br /> (ac) (ac'ft) (ds) (h5) <br />6,633.66 0.508 0.000 0.000 Top of Sed. Storage <br />6,634.00 0.526 0.177 0.000 <br />6,634.50 0.552 0.447 0.000 <br />6,635.00 0.578 0.729 0.000 <br />Filename: 100pond7-4.sc4 Printed 04-24-2001 <br />