Laserfiche WebLink
SEDCAD 4 for Windows <br />Copyright 1998 Pamela J Schwab <br />Civil SoNware Design <br />Structure #3 (Pond <br />n. coal, slope <br />Pond Inputs: <br />Structure Detai/; <br />Initial Pool Elev: 6,640.00 <br />Initial Pool: 4.01 ac-R <br />'Sediment Storage: 1.88 ac-ft <br />Dead Space: 20.00 <br />*Sediment capacity based on Average Annual R of 70.0 for 2 year(s) <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(R) Sideslope Sideslope Width (ft) <br />6,640.00 10.00 2.50:1 2.50:1 6.00 <br />Pond Results: <br />• <br />Peak Elevation: 6,640.98 <br />H'graph Detention Time: 2.44 hrs <br />Pond Model: CSTRS <br />Dewater Time: 1.35 days <br />Trap Efficiency: 93.06 <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br /> <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-R) Discharge <br /> <br />(~s) Dewater <br />Time <br />(hrs) <br />6,634.30 0.541 0.000 0.000 Top of Sed. Storage <br />6,634.50 0.552 0.111 0.000 <br />6,635.00 0.576 0.394 0.000 <br />6,635.50 0.606 0.690 0.000 <br />6,636.00 0.634 LOOP 0.000 <br />6,636.50 0.662 1.324 0.000 <br />6,637.00 0.692 1.662 0.000 <br />6,637.50 0.721 2.015 0.000 <br />6,638.00 0.752 2.383 0.000 <br />6,638.50 0.783 2.767 0.000 <br />6,639.00 0.815 3.167 0.000 <br />6,639.50 0.847 3.582 0.000 <br />Filename: 25pond7-4rev.sc4 Printed 07-19-2001 <br />