Laserfiche WebLink
TABLE OF CONTENTS <br />• BACKFILLING AND GRADING <br />BACKFILLING AND GRADING ........................................ 2.05.4(2)(c) - 1 <br />Backfilling and Grading Methods ................................. 2.05.4(2)(c) - 1 <br />General Grading Requirements .................................. 2.05.4(2)(c) - 1 <br />Final Graded Slopes ..................................... 2.05.4(2)(c) - 1 <br />Terraces .............................................. 2.05.4(2)(c) - 1 <br />Small Depressions ...................................... 2.05.4(2)(c) - 2 <br />Steep Slopes ........................................... 2.05.4(2)(c) - 2 <br />Final Grading .......................................... 2.05.4(2)(c) - 2 <br />Final Pit Backfilling ...................................... 2.05.4(2)(c) - 2 <br />Thin and Thick Overburden ..................................... 2.05.4(2)(c) - 2 <br />Disposal of Excess Spoil ....................................... 2.05.4(2)(c) - 3 <br />Postmining Topography ....................................... 2.05.4(2)(c) - 4 <br />Postmining Drainage Channels ................................... 2.05.4(2)(c) - 7 <br />Slides and Other Damage ...................................... 2.05.4(2)(c) - 8 <br />• Postmining Pond Retention ....................................... 2.05.4(2)(c)-S <br />LIST OF ATTACHMENTS <br />Reclaimed Krill Drainage Channel Design ............ATTACHMENT 2.05.4(2)(c) - 1-1 <br />Reclaimed Krill Drainage Channel Design West Lateral ..ATTACHMENT 2.05.4(2)(C)- 2-1 <br />Reclaimed San Miguel Power Drainage Channel Design .ATTACHMENT 2.05.4(2)(C)- 3-1 <br />i• <br />