Laserfiche WebLink
r ~- <br />' <br />CF&I STEEL CORPORATION <br />Canon Dolomite Quarry 77-376 <br />Mining Plan <br />A. IYhere is topsoil and where do they store it? <br /> <br />There is little, if any, topsoil in this area. No topsoil will <br />be removed; thus, there will be no need for any storage. <br />B. Acreage mined each year? <br />Approximately 1 to 2 acres will be mined each year. <br />Exhibit C <br />The acres are shown on the quarry areas. 11 developed acres + <br />ZZ future acres = 33 total acres. This is a 20-year plan; <br />therefore, 1.65 acres are mined per year. <br />C. {Vhat is slope? <br />The slope of the affected land is 30-400. <br />D, How much is dumped and can it be used in revegetation? <br />Less than 300 tons per day of -3/8" material is dumped. <br />Yes, these fines can be used for revegetation, <br />E, Do they have culverts for dump and where are they located? Type? <br />There are no culverts now. <br />Exhibit D - Page 1 - Paragraph 4 - Last sentence, <br />"Culverts will be installed beneath the dump to insure <br />proper drainage when needed." <br />Location cannot be determined until they are used, if at all. <br />If culvert is needed, it will be 18"-24" corrugated piping. <br />