Laserfiche WebLink
.: <br /> <br />2. RECLAbtATION PLAN <br />7 <br />f. 14here is your reclamation timetable? <br />The reclamation timetable is given in <br />Exhibit "E" - Reclamation Plan. <br />Exhibit E - Page 1 - Paragraph 1 <br />"Reclamation will begin with the revegetation <br />of the depleted upper Quarry site in about two <br />years." <br />Exhibit E - Page 2 - Paragraph 2 - Last Sentence <br />"This will all be done in the late fall to take <br />advantage of winter and early spring moisture." <br />Exhibit E - Page 2 - Paragraph 3 <br />"The developing quarry sites (area 3 and 4 in <br />Exhibit "C") will be revegetated as mining progresses. <br />Reclamation of the newly depleted areas will follow <br />the mining phase as closely as practical." <br />g. How will end use be wildlife habitat? How big a <br />pit will it be? <br />Revegetation of the affected land will be comparable <br />to the surrounding land. Thus, it can be expected <br />that the wildlife will expand their habitat into the <br />reclaimed area. <br />The Quarry is mined in benches 28-30 ft high and 0-100 ft <br />wide. The affected land is on a hillside and there is no <br />oit as such. <br />