My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29835
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:43 PM
Creation date
11/20/2007 11:33:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Hydrology
Doc Date
7/28/1997
Doc Name
2ND QUARTER 1997 INSPECTIONS
From
NEW HORIZON MINE
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />WATER, SIDII~~N'T, OR SLURRY <br />Inspectors Name : jl , L , G~~~ Date : ? - z~- 91 <br />NPDES ID. No.:CO-0000213 005 Date Last Inspected: 3-Z~-9"t <br />Facility Configuration:side Hill Pond <br />Site Name: Im~loundment #005 <br />Mine Name: New Horizon Mine <br />Mine ID No.: CMLRD Permit #0008-81 <br />Location:47N16W36AD <br />Location:2 mi.NW of Nucla, CO. <br />Owners Rep.: R. L. Wade, Mine Manager <br />CIRCLE OR WRITE IN APPROPRIATE RESPONSE <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7. <br />B. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />18 <br />19 <br />Foundation Preparation (removal of vegetation, sturt~s., topsoil) ~ No N/A <br />Lift thickness (inches) 1Z ~ N G~ <br />Con action according to approved plan <br />Burning (specify extend and location) <br />Angle of slope: 3'1 upstream, 3'1 downstream <br />Seepage (specify location, color, and approx. volume) <br />a.) From underdra in pipes: <br />b.) At isolated points on emban)mient slopes: <br />c) At natural hillside: <br />d) Over widespread areas <br />e) From downstream foundation area <br />f) "Boils" beneath scream or ponded water <br />Cracks or scarps on crest <br />Cracks or scraps on slope <br />Sloughing or bulging on slope <br />Major erosion problems <br />Surface rt~vements in valley bottom or on hillside <br />Erosion of tce <br />Water irtq~ounded against tce <br />Existing emban)anent freeboard lfeet) <br />Cracks, bulging, or erosion on upstream face <br />Visible sumps or sinkholes in slurry surface <br />Clogging <br />a) Spillway charnels and pipes <br />b) Decant system <br />c) Diversion Ditches <br />Cracking or crushing of pipes <br />a) Spillway pipes <br />b) Decant system <br />Trash racks clear and in place <br />! ON.V \d '9e~ <br />No N/A <br />Yes ® N/A <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes ®o <br />Yes <br />Yes <br />Yes <br />Yes <br />13~ <br />Yes <br />Yes <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />Feet <br />N/A <br />N/A <br />Yes ® N/A <br />Yes ® N/A <br />Yes ~ N/A <br />Yes ®, N/A <br />Yes ~ N/A <br />No N/A <br />-~~ ~ - 9'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.