Laserfiche WebLink
• FJ~BTT L <br />RECLAMATION COSTS <br />Due to the type of proposed reclamation, the site conditions, and <br />final land use, the costs of reclamation are expected to be minimal. <br />Good management and control during the mining operation by the mining <br />supervisor will minimize the expense to Weld County (the owner and <br />operator). <br />Reclamation costs are estimated to be as follows: <br />Site Preparation <br />$ 50.00/acre <br />Fertilization, seed and planting $470.00 <br />Mulch ~ $ 60.00 <br />Total cost 12.265 acres x $580.00 = $7,113.00. <br />$580.00/acre <br />The attached letter guarantees reclamation at the site by Weld County. <br /> <br />.. <br />